- The main results of the funded prect will be:
- Data base on test facilities for CBRNE detection equipment & methods/standards
- Outline for joint testing exercises
- Report on standards, specification for CBRNE detection methods and relevant labelling systems
- Workshops & proceedings on specific topics related to testing of CBRNE-detection equipment
- Road map for an European certification system for CBRNE sensor systems and devices
- Report “The future of testing security related products”
- Periodic newsletter and CREATIF web-site
- Business plan for an independent CREATIF Network of test facilities
the formal deliverables under the FP7 contract are listed below. Most of them are public and will be available in electronic form for download from the web-site.
- D.1.1 Glossary to define common language and delimitations for testing, evaluation and certifying
download pdf
- D.2.1.1 Data base on test facilities (Chemical, Biological, radiation, Explosives detection system testing)
- D.2.1.2 Workshop report incl. presentations
download pdf
- D.2.1.3 List on standards and methods detection testing (C / B / RN /E)
- D.2.1.4 Outline for joint testing (round robin exercise) (C / B / RN /E)
- D.3.1 Draft operational testing framework
download pdf
- D.3.2 Technology user needs and user feedback compilation document
- D.4.1 Report on the state of art of existing standards, specification for different CBRE detection methods and existing relevant labelling systems
- D.4.2 Road map for developing a European certification system for CBRE sensor systems and devices
- D.4.3 Discussion paper on suggested minimum requirements for testing facilities becoming members of the network (“certify the certifier”) as a starting point for a certification mechanism of test facilities
- D.4.4 Workshop on certification of CBRNE detection systems
download pdf
- D.5.1 Report “The future of testing security related products” (incl. workshop proceedings)
- D.6.1 Structure for database on testing facilities
- D.6.2 CREATIF Website
- D.6.3 = D.2.1.2 Workshop proceedings on the role of testing to improve market conditions and foster communication between end-users and producers download pdf
- D.6.4 Periodic newsletter
- D.6.5 Business plan: Network of test facilities for CBRNE detection (incl. rules of membership)
- D.0.1 Interim activity report
- D.0.2 Final report
top |